Construction on the Akbar Chowk Flyover in LHR has resumed

Construction on the Akbar Chowk Flyover in LHR has resumed

In order to make Maulana Shaukat Ali Road a partially signal-free corridor, work has resumed on the Akbar Chowk Flyover and Remodeling project, according to a news source on May 19.

Read more with EL news: Shared proposal for the development of ISB per 1960 plan

According to the specifics, there was a delay of almost two and a half months, and now construction has started again. The project’s cost will rise from PKR 3.1 billion to PKR 5.035 billion as a result of the changed design. It was revealed that adding three protected U-turns and building flyovers on either side of Akbar Chowk have raised the price.

According to reports, the U-turns will be built after passing Shoq Chowk and will be extended to Pindi Stop after passing the intersection with Model Town Link Road. By September, the project is supposed to be finished.

According to the news source, the project will reduce environmental difficulties, enhance traffic flow at the crossroads, give commuters commuting between Kot Lakhpat and Main Canal Road a hassle-free drive, and save them time and energy.

Share this: